To become more energy efficient, a facility’s central plant chilled water and/or heating equipment and component’s must be designed, installed and operated as a single, integrated system, not as a collection of independent components and controls. The larger the building and cooling load, the more critical it is to design, operate and maintain your central plant for optimum energy performance.

Central Plant optimization is a process. There are seven key steps to achieving Central Plant Optimization at your California organization, encompassing everything from infrastructure design and component selection to measurement and maintenance. Central Plant Optimization can deliver sustained central plant energy savings of up to 60%.